|
|
|
|
|
Dr. Kadri Dagdelen
Professor
Office
Phone: (303) 273-3711 |
|
Academic Appointment & Responsibilities
1992 – Present: Colorado School of Mines, Mining Engineering Department
Professor
Courses include:
MNGN300 - Summer Field Session MNGN312 - Surface Mine Design MNGN433 - Mine Systems Analysis MNGN438 - Introduction to Geostatistics MNGN512 - Surface Mine Design MNGN523 - Selected Topic MNGN530 - Introduction to Computer Applications in Mining MNGN538 - Geostatistical Ore Reserve Estimation MNGN539 - Advanced Geostatistics MNGN536 - Advanced Operations Research Applications in Mining Engineering
Professional Experience
1985-1992: Homestake Mining Company, Golden, Colorado
Manager - Technical Systems
Responsible for coordinating and supporting technical computing activities for ore reserve estimation, geostatistics, mine planning and ore control functions of U.S. Mine Operations. Performed studies investigating sources of discrepancies seen between geostatistically estimated ounces and actual mine production. Estimated ore reserves by lognormal kriging, reviewed mine plans and economic analysis. Geostatistically optimized and designed with project geologist the optimum placement of 75,000 Ft. of the core hole drilling for the Rack River 1991 exploration program. Directed the software development as well as designed and wrote technical systems which resulted in a) software used for 3-Dimensional ore target evaluation for underground mining at the Homestake mine in Lead, South Dakota; b) software used for geochemical exploration in the reconnaissance of gold deposit by the Exploration group.
Senior Mine Planning Engineer
Designed and wrote a more efficient Data Base Management, Geologic Mapping, Ore Reserve estimation and Pit Design-Scheduling software that resulted in better ore reserve predictions and more accurate maps. Designed and developed a computer based interactive short term planning system at the McLaughlin mine. This new system replaced the manual ore control practices with a more efficient optimizing system that not only allowed analysis of multiple ore- waste boundary design scenarios for daily production decisions but also reduced the planning time by half. The blasthole management system consists of 10 thousand lines of Fortran, and LISP routines and includes: Computer programs to electronically capture, manage and transmit gold assay information at the McLaughlin assay laboratory; a blasthole management system for blasthole survey data reduction, assay merging and plotting software; and a graphical user interface, and interactive ore-waste boundary design optimization software.
Mine Planning Engineer
Designed and developed a series of computer programs for geostatistical deposit modeling and recoverable reserve estimation which were used to build a comprehensive geostatistical block model for the McLaughlin Gold Deposit. Designed and developed sectional geologic reserve modeling programs that provided the most reliable reserve estimates for the McLaughlin type vein controlled gold mineralization. Designed and developed computer programs to create economic block models for deposits that contain multiple ore types requiring multiple metallurgical processes. Trained geologists and mine engineers at the mine site in using these programs for estimating mineable ore reserves for annual budgeting and planning. Designed and developed computer programs to optimize open pit designs. These programs are used at the McLaughlin mine to investigate multiple development schedules which optimized cash flows. The programs served as the basis for an optimization study that resulted in a $25 million McLaughlin mine and mill expansion.
Professional Certifications
Education
Colorado School of Mines
Ph.D. Mining Engineering, 1985 Geostatistics; Mine planning and optimization
M.Sc. Mining Engineering, 1979 Mine planning and computer simulation
B.Sc. Mining Engineering, 1976
L'ecoledes Mines de Paris
Master of Engineering (equivalent), Geostatistics, 1981
Honors & Awards (2000 to Present)
Distinguished Service Award, Minerals & Exploration, SME, 2006
Service to Professional Societies & Organizations (2005/2006)
SME Board member (2002-2006), SME M&E Division, Executive Committee Member (2000-2006)
Current Professional Organization Memberships (2005/2006)
Society for Mining, Metallurgy, and Exploration, Inc. (SME)
Professional Publications, Presentations & Short-courses
Author of 38 technical publications, 4 (technical manuals, books, or theses). Presenter of 52 (technical meetings/conference, short-courses, training)
Research and Related Activities
Have actively participated in 12 public and privately sponsored research and/or development programs related to mining.
Current Grants, Contracts, and Research (2005/2006)
2003 – 2005 PI, Development of Highwall Monitoring System, Kennecott Energy Company
2005 – 2006 PI, Development of Truck Proximity Warning System for Open Pit Mines, Newmont Mining Company
2001 – 2006 PI, Integration of GPS, RFID, Radar and Video Camera technology into an integrated Proximity Warning System, NIOSH
2005-2006 PI, Open Pit Mine Strategic Planning and Optimization, Newmont Mining Company, Phelps Dodge and Placer Dome |
|