Mark Kuchta
Associate Professor


Before joining the Mining Engineering Department in August 1999 I had spent nine years at the Swedish mining company LKAB, which owns and operates two of the largest and most modern underground mines in the world today.

 

While employed within the Department of Mining Research and Development at LKAB, I had the opportunity to work with cutting-edge technology used in large-scale sublevel caving including gravity-flow modeling, mine automation, underground communications networks, and state of the art computer systems for mine planning, modeling, and control. I later joined the Mine Planning department at the Kiruna mine where my primary duties were long and short term production planning and scheduling.  During this time I developed and implemented a new computer system for production planning and follow-up which is currently being used at both the Kiruna and Malmberget mines.  I was also actively involved in the ongoing project to implement remote controlled LHD's in the Kiruna mine.

 

I try to incorporate my ten years of practical industrial experience with one of the world’s largest and most modern mining companies into both my teaching and research activities.

 

Research Interests :

Henderson Underground Science and Engineering Project (HUSEP), the goal of which is to develop underground science at the Henderson Mine, Serve as the CSM Executive Committee representative, Chair the Mining and Engineering Committee

 

The Deep Underground Science and Engineering Laboratory (DUSEL)

 

Waterjet Scaling –Currently researching the use of waterjet scaling for the reduction of scaling accidents in underground mining, NIOSH supported

 

Blasting Optimization – Currently involved The Optimum Rock Excavation Project, a NIOSH sponsored initiative to develop careful blasting techniques to reduce fall of ground accidents in underground mining.

 

Mine Scheduling and Optimization –Developed and implemented a mixed integer mine production scheduling system for LKAB’s Kiruna Mine.

 

Courses Instructing :

MNGN210 Introductory Mining Engineering

MNGN314 Underground Mine Design

 

MNGN516 Advanced Underground Mine Design

MNGN515 Mine Mechanization and Automation

MNGN518 Advanced Bulk Underground Mining Techniques

MNGN499 Shotcrete as Ground Support 

MNGN599 Blasting Principles for Open Pit Mining

MNGN599 Advanced Gravity Flow of Broken Rock

 

Selected Publications :

Open Pit Mine Planning and Design, 2nd Edition, W. Hustrulid , M. Kuchta, 2006, Taylor and Francis

 

"A Review of Long and Short-Term Production Scheduling at LKAB's Kiruna Mine", Newman, A., M. Martinez and M. Kuchta, in Handbook of Production Scheduling, Herman, J., W., editor, Springer, 2006, pp 265-286

 

“Using Aggregation to Optimize Long-term Production Planning at an Underground Mine”, Newman, A., and Kuchta, M. European Journal of Operational Research, Approved for publication, October, 2005

 

“The Importance of Rock Surface Preparation in Shotcreting Operations”, Kuchta, M., Hustrulid, W., and Lorig, L., in Surface Support in Mining, Potvin, Y., Stacey, D., and Hadjigeorgiou, J., editors, Australian Centre for Geomechanics, September, 2004, pp 283-290

 

The Development and Implementation of a Mixed Integer Programming Model for Production Scheduling at the Kiruna Mine”, Kuchta, M., MassMin 2004, Karzulovic, A., Alfaro, M., editors, Instituto de Ingenieros de Chile , August 2004, pp 441-445

 

“Implementing a Production Schedule at LKAB’s Kiruna Mine”, Kuchta, M., Newman, A., and Topal, E., Interfaces, Vol. 34, no 2, March-April 2004, pp 124-134

 

“Production Scheduling at LKAB’s Kiruna Mine Using Mixed-integer Programming”, Kuchta, M., Newman, A., and Topal, E., Mining Engineering, The Society of Mining, Metallurgy, and Exploration, Inc., Vol. 55, No. 4, April 2003, pp 35-40

 

“The Area Between a One-dimensional Ordinary Brownian Curve and a Straight-line Approximation”, Kuchta, M., Mathematical Geology, Vol.34, No. 6, August 2002,

pp 631-645

 

“Quantifying the Increase in Adhesion Strength of Shotcrete Applied to Surfaces Treated with High-pressure Water”, Kuchta, M., Transactions of the Society for Mining, Metallurgy, And Exploration, Inc., Vol. 312, 2002, pp 129-132

 

“Predicting Run-of-Mine Ore Grades for Large-Scale Sub-Level Caving at LKAB’s Kiruna Mine, Transactions of the Society for Mining, Metallurgy, And Exploration, Inc., Vol. 312, 2002, pp 74-80

 

 “A Revised Form of the Bergmark-Roos Equation for Describing the Gravity Flow of Broken Rock”, Kuchta, M., Mineral Resources Engineering Vol. 11, No. 4. December 2002, pp 349-360

 

Contact Information :

Office phone: (303) 273-3306
email: mkuchta@mines.edu

Web Page: