PROGRESS, PERFORMANCE AND PROJECT REPORTS

FINAL PROJECT REPORTS

UTC-UTI Report 001 – Arora, S. and Kaunda, R.B. “Linear Cutting Machine Tests on Microwave-Irradiated Granodiorite.” March 24, 2018.

UTC-UTI Report 002 – Swidinsky, A., Mifkovic, M. and Mooney, M. “Imaging Ahead of Tunnel Boring Machines with DC Resistivity.” October 7, 2020.

UTC-UTI Report 003 -Epel, T., Mooney, M. and Gutierrez, M. “Ground-Structure Interaction of Twin Board Tunnels and Cross-Passages in Soft Ground Pressure Balance Tunneling.” April 6, 2020. 

UTC-UTI Report 004 -Lu, H. and Gutierrez, M. “Uncertainty Analysis in Rock Mass Classification and Its Application to Reliability Evaluation in Tunnel Construction,” October 30, 2020. 

UTC-UTI Report 005 – Arora, K., Gutierrez, M. and Hedayat, A. “Experimental Study of Tunnels in Squeezing Ground Conditions.” October 5, 2020. 

UTC-UTI Report 006 -Khetwal, S.S., Pei, S. and Gutierrez, M. (2020), “Functional Resilience Evaluation of Road Tunnels Through Stochastic Event Simulation and Data Analysis.” November 30, 2020 

UTC-UTI Report 007 – Rodriguez-Nikl, T. and Mazari, M. “Resilience and Sustainability of Underground Transportation Infrastructure: Climate Vulnerability and Sustainability Assessments.” February 22, 2018.

UTC-UTI Report 008 – Pourhomayoun, M., Nagrecha, K., Mazari, M. and Tonatiuh Rodriguez-Nikl, T. “The Applications of Data Science and Big Data Analytics in Underground Transportation Infrastructure,” February 22, 2018.

UTC-UTI Report 009 – Mazari, M., Aval, S.F. and Rodriguez-Nikl, T. “Evaluating the Use of Recycled and Sustainable Materials in Self-Consolidating Concrete for Underground Infrastructure Applications.” February 22, 2018, July 31, 2020.

UTC-UTI Report 010 – Gangrade, R., Mooney, M. and Trainor-Guitton, W. “Quantifying Spatial Geotechnical Uncertainty to Advance the Practice of Risk Assessment and Decision-Making in Tunnel Projects.” August 17, 2021. 

UTC-UTI Report 011 – Wnuk, K. and Zhou, W. “Gutierrez M. “Post-Processing of InSar Persistent Scatterer Time-Series to Investigate Deformational Processes Induced by Subsurface Excavation.” September 30, 2021