Hill Hall HVAC Preventive Maintenance September 16 – 20, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: August 30, 2024

To: Hill Hall occupants
From: Tom Rohlman
Emergency Contact Info: 303-273-3238

Outage Date: September 16 - 20, 2024
Outage Time: 5:30am - 3:30pm
Purpose: HVAC Preventive Maintenance
System(s) Involved: Air handling units, exhaust fans, and air compressors

Effect(s) on Occupants: Very brief fluctuating space temperatures, heating and cooling will still be active, intermittent exhaust fan flow, intermittent Lab fume hood flow, personnel in and out of building spaces and corridors.
Comments: PLEASE SEE ATTACHED SAFETY ADVISORY FOR LAB SPACES
Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call me at 303-273-3238.

Thank you for your cooperation.

GRL Siding Repair September 16 -19, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: September 12, 2024

To: GRL
From: Tim Roberts
Emergency Contact Info: 303-257-6809

Outage Date: September 16 – 19, 2024 (or until completion)
Outage Time: 7:00am – 5:00pm
Purpose: Siding repair

Effect(s) on Occupants: The west side of GRL will have metal siding replaced that was damaged in a windstorm. There will be people on the roof and west exterior of the building. Loud noises will occur.
Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call Tim Roberts at 303-257-6809

Thank you for your cooperation.

Moly Building, Mines Park Occupants, and Shops 1 & 2, Moly Road Closure, July 29 – September 17, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: July 25, 2024

To: Moly Building, Mines Park Occupants, Shops 1 & 2
From: Summer Schaller
Emergency Contact Info: 720-209-7032

Outage Date: July 29 - September 17, 2024
Outage Time: All day
Purpose: Utility work in the street & sidewalk along Moly Road
System(s) Involved: Vehicle & pedestrian access along Moly Road.

Effect(s) on Occupants: Moly Road will be closed to all vehicle traffic starting Monday July 29, 2024 and will reopen on Tuesday September 17, 2024. Barricades will be placed at the intersection of Moly & 19th, and north of the driveway into the Moly building. All vehicle traffic will be diverted to Tangent Way, which is scheduled to reopen on Monday July 29, 2024. The sidewalk along Moly Road is scheduled to close Thursday August 1, 2024 and will reopen Friday August 23, 2024. All pedestrian traffic will be diverted to a designated route established on Tangent Way. Flaggers will be present during the closure to ensure safe street crossing at 19th.

Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call 303-273-3587.

Thank you for your cooperation.

UPDATE: Moly Building, Mines Park Occupants, and Shops 1 & 2, Moly Road Closure, July 29 – September 20, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: July 25, 2024

To: Moly Building, Mines Park Occupants, Shops 1 & 2
From: Summer Schaller
Emergency Contact Info: 720-209-7032

Outage Date: July 29 - September 20, 2024
Outage Time: All day
Purpose: Utility work in the street & sidewalk along Moly Road
System(s) Involved: Vehicle & pedestrian access along Moly Road.

Effect(s) on Occupants: Moly Road will be closed to all vehicle traffic starting Monday July 29, 2024 and will reopen on Friday September 20, 2024. Barricades will be placed at the intersection of Moly & 19th, and north of the driveway into the Moly building. All vehicle traffic will be diverted to Tangent Way, which is scheduled to reopen on Monday July 29, 2024. The sidewalk along Moly Road is scheduled to close Thursday August 1, 2024 and will reopen Friday August 23, 2024. All pedestrian traffic will be diverted to a designated route established on Tangent Way. Flaggers will be present during the closure to ensure safe street crossing at 19th.

Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call 303-273-3587.

Thank you for your cooperation.

Hill Hall HVAC Preventive Maintenance September 16 – 20, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: August 30, 2024

To: Hill Hall occupants
From: Tom Rohlman
Emergency Contact Info: 303-273-3238

Outage Date: September 16 - 20, 2024
Outage Time: 5:30am - 3:30pm
Purpose: HVAC Preventive Maintenance
System(s) Involved: Air handling units, exhaust fans, and air compressors

Effect(s) on Occupants: Very brief fluctuating space temperatures, heating and cooling will still be active, intermittent exhaust fan flow, intermittent Lab fume hood flow, personnel in and out of building spaces and corridors.
Comments: PLEASE SEE ATTACHED SAFETY ADVISORY FOR LAB SPACES
Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call me at 303-273-3238.

Thank you for your cooperation.

GRL Siding Repair September 16 -19, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: September 12, 2024

To: GRL
From: Tim Roberts
Emergency Contact Info: 303-257-6809

Outage Date: September 16 – 19, 2024 (or until completion)
Outage Time: 7:00am – 5:00pm
Purpose: Siding repair

Effect(s) on Occupants: The west side of GRL will have metal siding replaced that was damaged in a windstorm. There will be people on the roof and west exterior of the building. Loud noises will occur.
Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call Tim Roberts at 303-257-6809

Thank you for your cooperation.

Moly Building, Mines Park Occupants, and Shops 1 & 2, Moly Road Closure, July 29 – September 18, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: July 25, 2024

To: Moly Building, Mines Park Occupants, Shops 1 & 2
From: Summer Schaller
Emergency Contact Info: 720-209-7032

Outage Date: July 29 - September 18, 2024
Outage Time: All day
Purpose: Utility work in the street & sidewalk along Moly Road
System(s) Involved: Vehicle & pedestrian access along Moly Road.

Effect(s) on Occupants: Moly Road will be closed to all vehicle traffic starting Monday July 29, 2024 and will reopen on Wednesday September 18, 2024. Barricades will be placed at the intersection of Moly & 19th, and north of the driveway into the Moly building. All vehicle traffic will be diverted to Tangent Way, which is scheduled to reopen on Monday July 29, 2024. The sidewalk along Moly Road is scheduled to close Thursday August 1, 2024 and will reopen Friday August 23, 2024. All pedestrian traffic will be diverted to a designated route established on Tangent Way. Flaggers will be present during the closure to ensure safe street crossing at 19th.

Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call 303-273-3587.

Thank you for your cooperation.

Residence Hall VII Construction Parking Lot Closures

Up date on Residence Hall VII construction work in Parking lot A and F. On Wednesday, 9/18 work will begin in the area colored blue. Then on Thursday, 9/19 – Friday 9/20 the west entrance to parking lots A and F will be closed for work in that drive lane. The week of 9/23 work will continue in the blue area noted on the map.

As with all construction areas, please follow all signage, and safety personnel’s directions. Please be aware of your surroundings at all times.

Thank you for patience, as we continue the infrastructure work for the new residence hall.

Hill Hall HVAC Preventive Maintenance September 16 – 20, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: August 30, 2024

To: Hill Hall occupants
From: Tom Rohlman
Emergency Contact Info: 303-273-3238

Outage Date: September 16 - 20, 2024
Outage Time: 5:30am - 3:30pm
Purpose: HVAC Preventive Maintenance
System(s) Involved: Air handling units, exhaust fans, and air compressors

Effect(s) on Occupants: Very brief fluctuating space temperatures, heating and cooling will still be active, intermittent exhaust fan flow, intermittent Lab fume hood flow, personnel in and out of building spaces and corridors.
Comments: PLEASE SEE ATTACHED SAFETY ADVISORY FOR LAB SPACES
Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call me at 303-273-3238.

Thank you for your cooperation.

GRL Siding Repair September 16 -19, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: September 12, 2024

To: GRL
From: Tim Roberts
Emergency Contact Info: 303-257-6809

Outage Date: September 16 – 19, 2024 (or until completion)
Outage Time: 7:00am – 5:00pm
Purpose: Siding repair

Effect(s) on Occupants: The west side of GRL will have metal siding replaced that was damaged in a windstorm. There will be people on the roof and west exterior of the building. Loud noises will occur.
Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call Tim Roberts at 303-257-6809

Thank you for your cooperation.

Hill Hall HVAC Preventive Maintenance September 16 – 20, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: August 30, 2024

To: Hill Hall occupants
From: Tom Rohlman
Emergency Contact Info: 303-273-3238

Outage Date: September 16 - 20, 2024
Outage Time: 5:30am - 3:30pm
Purpose: HVAC Preventive Maintenance
System(s) Involved: Air handling units, exhaust fans, and air compressors

Effect(s) on Occupants: Very brief fluctuating space temperatures, heating and cooling will still be active, intermittent exhaust fan flow, intermittent Lab fume hood flow, personnel in and out of building spaces and corridors.
Comments: PLEASE SEE ATTACHED SAFETY ADVISORY FOR LAB SPACES
Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call me at 303-273-3238.

Thank you for your cooperation.

GRL Siding Repair September 16 -19, 2024

EMERGENCY / SERVICE OUTAGE MEMORANDUM
Notification Date: September 12, 2024

To: GRL
From: Tim Roberts
Emergency Contact Info: 303-257-6809

Outage Date: September 16 – 19, 2024 (or until completion)
Outage Time: 7:00am – 5:00pm
Purpose: Siding repair

Effect(s) on Occupants: The west side of GRL will have metal siding replaced that was damaged in a windstorm. There will be people on the roof and west exterior of the building. Loud noises will occur.
Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call Tim Roberts at 303-257-6809

Thank you for your cooperation.